Flow-through Racking:
1. CE Certificated
2. The depth is 800~3000mm, the height is not exceed 2500mm and loading capacity is 1000kg/layer
3. Using alumal or steel roller rail system
4. Under the influence of gravity, "first in and first out" for the goods is implemented
5. It's convenient to access and suitable for places such as the two sides of the assembly line, distribution center, etc.
Route:
Our office and factory are located in Nanjing, Jiangsu Province, China
1) You can fly to Nanjing Airport directly. We will pick you up on Nanjing Lukou International airport;
2) You can fly to Shanghai Pudong International Airport then come to Nanjing by High-speed railway, then we will pick you up in Nanjing South Railway Station.
All our clients, from domestic or abroad, are warmly welcome to visit us!
Others: |
Design |
professional design for your requirment:include choose the correct type for you,CAD drawing |
Price |
direct Manufacture price,according to your quantity,payment |
Package |
standard export package |
Payment |
30%prepaid T/T,L/C at sight
FOB,CNF,CIF |
Shippment |
FOB NANJING,FOB SHANGHAI |
CNF/CIF destination port |
Quick Delivery. |
Within 25 days for ordinary order quantity. Big production capacity allow us in a position to make quick delivery. |
Certification |
CE/ISO14001/ISO9001 |
Our Factory
workshop
Exhibition
Our Partner
Packaging & Shipping
Certifications